Integrated Health Projects is an established joint venture between VINCI Construction UK Limited and Sir Robert McAlpine Limited.

Staff and a patient open the new UTC for Swindon

17th July 2022

Staff and a patient open the new UTC for Swindon

Staff and a patient from Great Western Hospitals NHS Foundation Trust today (8 July) formally opened a brand new Urgent Treatment Centre on the hospital site.

The new facility was made possible after the Trust successfully bid for £15m of funding and demolition began on the old urgent care centre last May.

The new UTC building, which has been delivered by IHP (the alliance between VINCI Building and Sir Robert McAlpine) has additional clinic rooms and more space in both the adult and paediatric waiting areas. It also homes new plaster and ophthalmology rooms.

Designed with input from patients and staff, the UTC is inclusive and accessible for all; with the Trust’s first ever changing places facility for children and adults with disabilities, block colour pallets for patients with dementia, lowered reception desk access for wheelchair users and a sky ceiling to bring the outside, in.

It also uses calming colours, a nature theme in the children’s waiting area and displays artwork donated by local children, depicting their NHS hero.

Kevin McNamara, Chief Executive of the Trust, said: “Today, we officially opened our new Urgent Treatment Centre – a modern, fit-for-purpose building which will enable clinical teams to treat patients in the best possible environment.

“We successfully bid for £15m of national funding to help get us started, but today wouldn’t have been possible without the incredible support along the way of a number of people and organisations.

“It’s well-known that the health and care system is extremely busy and has been under significant pressure for some considerable time. Last year here at GWH we saw more than 117,000 attendances in urgent and emergency care.

“Whilst we know that a new building won’t solve the issues the system is experiencing, it does give us the chance for our fantastic multi-disciplinary teams to work together with colleagues from across the health and social care system to try to give patients the care they need it when they need it, and in the right place.”

The UTC will open its doors to the first patient on Wednesday 13 July and will be open 365 days a year, 7:00am – 10:00pm for patients to book in, closing at midnight. Local people are encouraged to call NHS 111 in the first instance, with trained operators who can advise of the appropriate healthcare option and book in for a timed appointment at the UTC if needed.

Changes are also now in place for patients accessing the Emergency Department. With a new clinical navigator in post, patients will be triaged at the door of the UTC and directed to a location in the hospital more suitable for their clinical needs.

This means all patients attending hospital as a walk-in must now enter the building through the UTC.

Dr Satinder Mann, Consultant in Emergency Medicine and Clinical Lead for the UTC, said: “I know there will be significant benefits for the patients using this new space. Recovery starts at the door and creating an environment that feels less clinical and more welcoming and calming will have profound positive impact on all who will attend.”

Next to the UTC is a new energy centre, which will generate energy to power the building through more sustainable means than the Trust has ever seen before.

The energy centre will help the Trust achieve its NHS Net Zero Carbon target through the installation of Air Source Heat Pumps which work without burning any fossil fuels and generate a 100% renewable electricity contract.

This has been a fantastic project. With the successful culmination of three years hard work by the Trust, our project team, consultants and supply chain, we are honoured to have been a part of delivering such an essential facility that will bring real benefit to the community, patients, staff and visitors for many years to come.

Russell Flowers, Regional Director at VINCI Building and IHP

Latest news

Emergency department project breaks ground at Tameside General Hospital
28th June 2022

Emergency department project breaks ground at Tameside General Hospital

A new Emergency Department redevelopment project at Tameside General Hospital took a significant step forward recently with an official 'breaking ground' ceremony held outside the unit on Monday 20 June 2022.

GMMP and IHP win Design in Mental Health Award
10th June 2022

GMMP and IHP win Design in Mental Health Award

Greater Manchester Mental Health NHS Foundation Trust's (GMMH) New Park House Development, which is being delivered by our IHP team has won a Design in Mental Health Award in the ‘Service User Engagement’ category.

Poole Hospital celebrates ‘topping out’ milestone
22nd May 2022

Poole Hospital celebrates ‘topping out’ milestone

The construction of the new theatre building at Poole Hospital reached a significant milestone with the celebration of a traditional ‘topping out’ ceremony on Friday 20th May.